Critical Dune Areas: The State Permit Behind Some Lake Michigan Building Lots

Beach grass on a sand dune

Updated October 2026.

Before you get attached to a Lake Michigan lot with a view over the dune, find out whether the state of Michigan gets a vote on what you build there. For a lot of the shoreline it does, and the vote comes in the form of a permit most buyers have never heard of.

The program is called Critical Dune Areas, and it comes from Part 353 of Michigan’s environmental code (the Sand Dunes Protection and Management Act). EGLE, the state environmental agency, administers it. The areas identified in 1989 cover roughly 74,000 acres along 265 miles of coastline, drawn on maps of 19 lakeshore counties. That 1989 date matters more than it sounds like it should, and it’s also the part of this story that has been moving, so I’ll get to both.

What the permit covers

If you do something that significantly alters a critical dune area, you need a permit from the state before you do it. EGLE’s examples are building a house or garage, putting in a road or driveway, installing a septic system, building a retaining wall, and removing sand. Taking out trees counts too. Their fee schedule has one line for removing three to nine trees and another for ten or more.

The fees on EGLE’s schedule (it shows an effective date of October 3, 2016, and it was still the posted schedule when I checked in October 2026): $1,300 for a single-family home and its associated infrastructure, $600 for an addition, a garage, a gazebo, a septic system for a single home, or demolishing a building, $250 for decks over 225 square feet and for retaining walls up to 100 feet, and $150 for a deck of 225 square feet or less. A project that needs a special exception pays another $2,000 on top. Those are application fees, not construction costs, and the real expense is usually the time and the redesign.

Review runs on a clock. EGLE has 30 days to decide whether your application is complete, then 60 days to process it, or 90 days if the project needs a public hearing. And a hearing is easier to trigger than most people expect. Under the statute, if two or more people who own property within two miles of your project ask for one in writing, it gets held. Two miles of shoreline is a lot of neighbors. If you’re closing in November and hoping to break ground in spring, put that timeline on a calendar.

Some small things are exempt. A stairway down the dune doesn’t need a permit if it’s elevated above grade, no wider than five feet including the landings, has no roof or walls, goes in without wheeled or tracked self-propelled equipment, and only disturbs vegetation in its own footprint. Miss any one of those and you’re filing an application. A boardwalk-style set of stairs is one thing. A switchback path with a skid steer is another.

Where the house can sit

The statute shapes the house too. A structure has to go behind the crest of the first landward ridge that isn’t a foredune, and if you build within 100 feet landward of that crest, four more conditions apply: a site plan prepared by a registered architect or licensed professional engineer, access from the landward side of the dune, restabilizing the dune with native vegetation, and no lowering of the crest. You don’t get to shave the hill for a better view.

A house generally can’t go on the first lakeward-facing slope or on a foredune at all. The narrow exception is a lot of record recorded before July 5, 1989 that doesn’t have enough buildable area behind the crest. Work on a slope steeper than one foot of rise per three feet of run can’t go through standard review, and a project that can’t meet the standard criteria has to apply for a special exception (that’s the extra $2,000). Every application also needs a site plan, a cross-section and a vegetation assurance, meaning what’s growing there, what your project does to it, and how it gets restored.

Which map counts

By statute, a critical dune area is a place designated in the atlas of critical dune areas dated February 1989. It isn’t defined by how the lot looks today. So a parcel that looks like ordinary wooded hillside can be inside the boundary, and a sandy lot with big hills can be outside it. You can’t eyeball this one. The 1989 criteria were features made mostly of dune sand, within 1.5 miles of a Great Lakes shoreline, at least a mile long along the shore and at least 20 feet tall, plus some exemplary dune plant communities. Because it keys off distance from the shoreline, a parcel behind the big dune complexes can sit inside a critical dune area without a foot of beach. Inland-lake frontage on Torch or Elk Lake is a different animal.

Then there’s the redraw. In the fiscal year 2024 budget the Legislature told EGLE to redo the delineation, and EGLE hired GEI Consultants, working with Michigan Natural Features Inventory, Michigan Tech and Michigan State. They used 1-meter elevation data, drone imagery and field checks through the 2025 growing season. The job cut both ways: correct the existing boundaries, add high-quality dune systems that aren’t protected now, and take off areas that no longer work like critical dunes. The proposed criteria also raise the minimum length of a dune feature from one mile to 1.5 miles. EGLE has published the delineation report and a 2026 Proposed Atlas of Critical Dune Areas.

Proposed is the word to hold onto. An earlier post of mine said Michigan had redrawn the map, and that overstated it. The statute still defines a critical dune area by the February 1989 atlas, EGLE’s maps page still points to that atlas, and EGLE describes the new work as giving legislators options to choose from. When I checked in October 2026 I found nothing showing the new atlas had been adopted. Until it is, the 1989 lines are what your permit gets measured against. On a given parcel the proposal could go either direction, so look at both maps.

Checking a parcel

EGLE’s maps, organized by county and township, are the only place I’d trust for the answer. I haven’t pulled the atlas for every parcel I’ve ever looked at, and I haven’t checked how the lines fall along Grand Traverse Bay or the Antrim shoreline, so don’t take a silence from me as a green light. The Lake Michigan side of Benzie and Leelanau counties is the obvious place to start. Frankfort, Elberta and the stretch up toward Glen Arbor are where I’d expect buyers to run into this first, and Frankfort is a good example of a town where the water is the whole appeal.

Once you know a parcel is in, the next question is where the buildable room is. Not how many acres, but where the crest sits and how much usable ground there is behind it. A three-acre parcel with all three acres on the lakeward slope is a lovely place for a picnic. Then check the proposed atlas to see whether the line moves on that parcel. If ground is proposed to come off the list, that might matter someday and nobody’s pricing it in. If it’s proposed to go on, you want to know before you pay an architect.

Local governments can take over the program in theory, but only three communities have: Pere Marquette Township in Mason County, and Peaine and St. James Townships on Beaver Island. Nobody in our five-county area has, so a permit up here goes to the state, not to your township zoning office. Getting a township zoning permit doesn’t tell you anything about whether you also need EGLE’s sign-off. (It’s the same kind of split we see with driveway permits on Old Mission, which I wrote about in this post.)

Where it bites in a purchase

Vacant land is where this gets expensive. A buyer who pays for a lot assuming a standard house plan will fit has paid for an assumption. If the parcel is in a critical dune area, the state can condition or deny the permit, and the footprint you drew on a napkin is no longer the footprint you get. It’s the same reason I keep telling land buyers a lot up here isn’t buildable until a sanitarian digs a hole.

Existing houses are less dramatic but not risk-free. An older cottage with an addition, a new retaining wall or a cleared view corridor may have been built without a permit it needed. I wouldn’t assume a seller knows. Ask directly whether any work on the property was done under an EGLE permit, and ask to see it. If the answer is a shrug, put the dune question in your inspection period and have your attorney or title company look at it.

It also changes what you should ask for in a purchase agreement on land. A permit contingency is reasonable on a dune lot, and 30 days for the completeness check plus 60 to 90 days of review is longer than most sellers want to wait. Expect a conversation about that. I don’t know how a given seller will react, and a lot of it comes down to how motivated they are.

The money involved is why I bother. In the numbers I had in August 2026, Leelanau County sold 151 homes in the first half of 2026, up from 130 in the same stretch of 2025, with an average sale price past $937,000, and Grand Traverse County’s median was $420,000. The high end up here is coastal, and a lot of coastal ground is dune.

None of this means a dune-area lot is a bad buy. Plenty of owners have gone through the process and built beautiful places. It just means the permit is part of the price, and you want to find out before closing, not after. If you’re looking at a Lake Michigan lot and want a second set of eyes on whether it falls in the mapped area, or which side of the proposed line it lands on, text or email me and we’ll pull it up together. Our current listings page is a decent place to see what’s out there if you want to browse first.

Have you dealt with a dune permit on a build or a purchase up here? I’d like to hear how long it took.

Checked against the sources linked above in October 2026.

Taylor Brown, Realtor
Taylor@taylorbrownrealtor.com

Previous
Previous

Fighting a Flood Zone Designation in Michigan: LOMA, LOMR-F and the Survey That Starts It

Next
Next

I Ask About the Property Transfer Affidavit Before I Ask About the Roof